Phase Objective Statement

The overall objective of this project is to provide SPX with a telemetry system capable of transmitting strain data from gauges attached to an operating impeller to a user interface of our choice. All transmission and reception must be wireless, and both gauges and telemetry systems must have reasonable life cycles.

This phase is dedicated to high level concept development for our system as well as narrowing down telemetry system and strain gauge choices to final candidates. Feasibility analyses for both strain gauge and battery life are included in this phase, and serve as a sanity check for our choice of system components. Research and benchmarking are of crucial importance to this stage, as we are getting closer to component purchase and validation.

Functional Decomposition

Functional Decomposition

Benchmarking

Gauge and Telemetry System Benchmarking

Criteria

  1. Battery Life
  2. Strain Gauge Accuracy
  3. Ease of Use
  4. Sensor Life
  5. Price

Concept Development

3 Parts of Concept Development

  1. Concept Generation
  2. Concept Improvement
  3. Concept Selection

Concept Development

Final Concept Generation Brainstorm

Final Concept Generation Brainstorm

Concept Generation Document

Morphological Chart

Morph Table

Morph Table

Morph Table

Concept Selection

Criteria

  1. Operator Workload
  2. Ease of Setup
  3. Ease of Assembly
  4. System Durability
  5. Cost
  6. Minimal Effect on Local Flow

Selected Concepts

Schematics

System 1

System 1

System 2

System 2

System 3

System 3

Pugh Table

public/Photo Gallery/PughTables.JPG

Concept C is a reference to the old SPX system. Noted from the Pugh Tables, Concept A and B are far superior to C, with A being even better than B. From this analysis, it follows that Concept A is the best option.

Systems Architecture

Systems Architecture

Systems Architecture

Feasibility: Strain Gauge Life and Battery Life

Feasibility - Gauge Life

Feasibility - Battery Life

Risk Assessment

Risks Trend

Risks Trend

Risk Graph

Risk Graph

Risk Tracking

Design Review Materials

Systems Design Review Presentation

Systems Design Review Notes

Systems Design Review Action Items

Action Items

Plans for Next Phase

The link below leads to our live Project Planning document. Each tab represents a different phase of Senior Design.


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation