P16318: Gaseous Flow Rate Meter
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Summarize:

Test Results Summary

Instructions

  1. Quantitatively summarize the capabilities, performance, throughput, and robustness of your subsystems as demonstrated by execution of the test plan. Document your testing with photos or videos in addition to test data.
  2. Evaluate how well the test plan was able to confirm satisfaction of subsystem and system requirements
  3. Include snapshot of testing completed to date, and include link to live requirements and testing document
 Cam and Ball :)

Cam and Ball :)

 Cam and O-ring Seal Design :/

Cam and O-ring Seal Design :/

Inputs & Source

  1. Test Plan
  2. Subsystem fabrication

Outputs & Destination

  1. Test Results
  2. System integration

Risk and Problem Tracking

Functional Demo Materials

Include links to:

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation