P16318: Gaseous Flow Rate Meter
/public/

Subsystem Build & Test

Table of Contents

Project Update

Team Vision for Subsystem Level Build & Test Phase

Summarize:

Our shared vision has been changed and to summarize we have aSummary of New Shared Vision.

Test Results Summary

Mock up Delrin output fitting

Mock up Delrin output fitting

Write up of seal testing and Oring testing

Output fitting and Oring seal leak test show positive results that the device will seal once the correct output fitting has been manufactured.

Test Plan

Our test plans have changed slightly since the last review. New Equipment Plans Can Be Seen Here

Subsystem fabrication

All purchased parts are in and most of the fabricated parts are complete. The housing pictured below needed some additional modification to ensure proper fitment. The only critial components left for fabrication are the Cam and output fitting. The Cam is being delayed until the actuator can be controlled. This is critical for finding the home position and aligning the Cam.

 Aluminum Housing

Aluminum Housing

Risk and Problem Tracking

Risk Management

and

Problem Tracking

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation