P16411: Pulsed-Corona Water Purification
/public/

Subsystem Design

Table of Contents

Team Vision for Subsystem-Level Design Phase

Summary

Our project hinges around our water purification subsystem. This is where almost all of our variables meet. We set out to break this subsystem down into as many manageable parts as possible to reduce risk and decrease complexity.

We were able to break the system down as much as we felt possible and create a system for testing so we will be able to make incremental improvements in the system and find where errors might surface.

Feasibility: Prototyping, Analysis, Simulation

Drawings, Schematics, Flow Charts, etc.

Bill of Materials (BOM)

Risk Assessment

Plans for next phase

Our group will be moving forward with the test plan.


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation