P16414: Toilet Use Sensor
/public/

Preliminary Detailed Design

Table of Contents

Agenda

Team Vision for Preliminary Detailed Design Phase

Week 15 Plans

Week 15 Plan

Week 15 Plan

Purchasing

Prototyping

End Cap 3D Model

End Cap 3D Model

Setup of Microcontroller and Sensors

Setup of Microcontroller and Sensors

Drawings and Schematics

Wiring Schematic

Wiring Schematic

For schematics of the physical module concept, please visit our Systems Design and Subsystems Design pages.

Simulations

Mock-up Use Data

Mock-up Use Data

Mock-up Temperature Data

Mock-up Temperature Data

Mock-up Moisture Data

Mock-up Moisture Data

Mock-up Range Finder Data

Mock-up Range Finder Data

Bill of Material (BOM)

Bill of Materials

Bill of Materials

Preliminary Budget

Preliminary Budget

Test Plans

Test Plans

Test Plans

Risk Assessment

Updated Risk Assessment

Updated Risk Assessment

Plans for the Next Phase

Plans for the Next Phase

Plans for the Next Phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation