Since the first round of boiler base was too small and too weak, another larger and stronger base was manufactured. Also, the tin and tube tray have been manufactured and tested. Everything works as expected except the warping of the tube tray. Tube tray design will be modified to incorporate more thermal mass into the tin tray. Lastly, linear actuator mount is being worked on and is on schedule to be completed and tested soon.

Team Vision for Integrated System Build & Test Phase

Summarize:

Manufacturing Progress

Base

Base Fit

Base Fit

Base Making Process

Base Making Process

Finished Base

Finished Base

Base Comparison - Side

Base Comparison - Side

Base Comparison - Top

Base Comparison - Top

Actuator Mount

CAD Drawing of Actuator Mount

CAD Drawing of Actuator Mount

Test Results Summary

Tube Tray Test

Empty Tube Tray

Empty Tube Tray

Tube Tray - Dispensed

Tube Tray - Dispensed

Tube Tray - Solidified

Tube Tray - Solidified

Tube Tray Finish - Side

Tube Tray Finish - Side

Tube Tray Finish - Top

Tube Tray Finish - Top

Warped Tube Tray

Warped Tube Tray

Fixing Tube Tray

Fixing Tube Tray

Tin Tray Test

Empty Tin Tray

Empty Tin Tray

Tin Tray - Dispensed

Tin Tray - Dispensed

Tin Tray - Solidifed

Tin Tray - Solidifed

9 Finished Tin Tray

9 Finished Tin Tray

1 Finished Tin Tray

1 Finished Tin Tray

Net Material Weight: Tin

Weight from tray

Weight from tray

Weight when topped

Weight when topped

Tin weight

Tin weight


Home | Planning & Execution |

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation