P16421: Robo-Composter
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Motors are running and one tank is formed. The grinder is partially assembled with the exception of fingers between the blades.

Test Results Summary

The only testing done has been on the grinder which was extremely successful. However it is going to be vital that the fingers get installed in order to minimize buildup of material and keep it functioning properly

Risk and Problem Tracking

Plans for next phase

By the next demo everything should be mounted in the frame and operating so some testing can be done. Additionally some work on the website needs to be done because it is not functioning right now.

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation