P16452: Active Reciprocating Compresor Valve Assembly
/public/

Planning & Execution

Table of Contents

Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

Content related to this node should go in the [Project%20Management Project Management] directory. Several templates have been posted there for your reference.

All template text and instructions must be removed prior to the Week 3 Problem Definition Review

Intellectual Property Considerations

Is your team considering filing for a provisional or non-provisional patent? Does your project's financial support carry any IP requirements? Are there select elements of your project that your customer has required that you keep confidential?

There is an excellent set of short videos for reference at https://www.youtube.com/playlist?list=PLmNrnoyQ30KvvBuMJXaPjdFjq-Jm6ghqE

Team Setup

Project Plans & Schedules

Project Plan Time Line

Project Plan Time Line

Project Plan

Project Plan

Risk Assessment and Growth Curves

Purpose

  1. Facilitate anticipation, avoidance, abatement and accommodation of problems.
  2. Assess team process capability to drive risk importance total to zero by project end.

Instructions

  1. Instructions and EXAMPLE must be deleted before the System-Level Design Review.
  2. Identify an owner for this document.
  3. This document will be inspected at all project reviews.
  4. Consider technical, logistical, and resource related risks.
  5. Importance is calculated as the product of likelihood and severity.
  6. Create a projection graph of the total importance over time showing how that approaches zero near the end of MSD2.
  7. Update this chart and graph at the end of each cycle.
  8. Considering the purpose, the team should anticipate potential failure modes associated withe construction and use of this document.

Inputs and Source

  1. Team members.
  2. Template and Example.
  3. Reference doc.
  4. Customer Requirements.
  5. Engineering Requirements.
  6. System and Detail Designs.
  7. Procurement, Production, and Assembly plans.
  8. Test plans.
  9. Overall Process.

Outputs and Destination

Completed form to be revisited at all project reviews.
Risk Management Template

Risk Management Template

Technical

Safety

Resources

Meeting Minutes, Notes, & Actions

MSD I & II. Maintain a record of team/guide meetings. This includes discussion, action items, decisions made, and work assigned. Meeting Minutes

Peer Reviews

Project Reviews

Preparation, notes and actions, etc. Refer to Project Review page, as well.

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation