P16453: Loading, Measurement, Control, and Test of a
Journal Bearing Test Platform
/public/
Build & Test Prep
Table of Contents
|
Team Vision for Build & Test Prep Phase
- Design a Test Plan
- Document potential failures
- Create plans to circumvent foreseeable issues
- Begin ordering parts for Backlash Removal System & Joint Redesign
Test Plan Summary
- Calibrate new Load Cell Signal Conditioners using known weights
- Calibrate Accelerometers
- Verify new computer with old software & I/O
- Build and gradually apply load to backlash system to verify integrity
- Verify integrity of new mating faces/joint redesign
Risk and Problem Tracking
For the full Problem Solving Process document, click here.Plans for next phase
- Begin Technical Paper & Poster
- Continue updating BOM as changes occur
- Update Risk Assessment
- Connect & Test Accelerometers
- Turn new Shafts & Grind for Precision
Home | Planning & Execution | Imagine RIT
Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design
Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation