P16462: Wind Energy Base Station
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

Week 8 Shared Vision

Week 8 Shared Vision

Test Results Summary

Duty Cycle Test with varying frequency

Duty Cycle Test with varying frequency

Motor Test Video

Duty cycle from 20% upto 80% tested at 1kHz-20kHz. This was to find approximately what frequency the motor delivers the most power. 9-10kHz

EE components Enclosure

EE components Enclosure

Risk and Problem Tracking

Risk

Week 8 Updated Risk Table

Week 8 Updated Risk Table

Problem Tracking: Flight
Problem Tracking

Problem Tracking

We plan to run tethered trials again with the new bridle and run tests to determine appropriate bridle positions and launch methods to stabilize flight the best. This will be done by trial and error with predictions based out of calculated bank angles per bridle position with flight at static equilibrium. All trials will be recorded with controls, bridle position and tether length, results of the flight, and noted possible adjustments to later trials.

Finalized CAD Models and Part Information

Reel Drum

Reel Drum

Shaft - Gear Side

Shaft - Gear Side

Shaft - Support Side

Shaft - Support Side

Base Plate

Base Plate

Functional Demo Materials

Include links to:

Plans for next phase

Team
Week 11 Shared Vision

Week 11 Shared Vision

Individual

Week 11 3 Week Plan

Week 11 3 Week Plan

Week 11 3 Week Plan

Week 11 3 Week Plan


Home | Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation