Table of Contents

Team Vision for Integrated System Build & Test Phase

During this phase we completed the dehydrator with the exception of a couple non-critical components. The water system has been assembled, but a few subcomponents need to be adjusted. Testing of critical subcomponents such as the smoke detector and weight requirements of the dehydrator.

Subsystem Testing

Test & Build Plans

Water Pasteurization System (Test Plans)

Water System Build Plan

Leaf Drying System (Test Plans)

Leaf System Build Plan

Combined System

Leaf System Test Results

Water System Test Results

Risk and Problem Tracking

Risk Mitigation Phase 3

Risk Mitigation Phase 3

Functional Demo Materials/Supplemental Information

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation