At the end of the last review we thought we were in good shape to move forward and were ready for testing; however, we soon ran into some trouble. Not only did we need to run through a bunch of testing this phase, but we needed to solve some critical issues before we could get started.

Even with all of these issues, we were able to overcome several of them. We were able to complete all of our preliminary tests, and set ourselves up for success immediately following Spring Break.

Team Vision for Integrated System Build & Test Phase

Road Blocks Before We Could Get Started

Luckily for us, we were able to identify these road blocks and target them immediately, but we went into this phase with a lot of work to complete.

Objectives Completed

Machining Components

public/MSD II\Integrated System Build and Test\Photos\VinceLathe.jpg

Photo of Vince and Joe working on the clamp pin

Part 007 - Outer Slides (95%)

public/MSD II\Integrated System Build and Test\Photos\OuterSlides.jpg

Part 013 - Inner Slides (100%)

public/MSD II\Integrated System Build and Test\Photos\InnerSlides.jpg

Part 024 - Clamp Pin (100%)

public/MSD II\Integrated System Build and Test\Photos\ClampPin.jpg

Outsourced Components

Part 001 - Outer Socket

public/MSD II\Integrated System Build and Test\Photos\OuterSocket.jpg

Part 002 - Inner Socket

public/MSD II\Integrated System Build and Test\Photos\InnerSocket.jpg

Part 003 - Ball Rod

public/MSD II\Integrated System Build and Test\Photos\BallRod.jpg

Part 018 - Clamp Primary

public/MSD II\Integrated System Build and Test\Photos\PrimaryClamp.jpg

Part 025 - Clamp Secondary

public/MSD II\Integrated System Build and Test\Photos\SecondaryClamp.jpg

Preliminary Testing

Step One: Find a New Way To Test

Instead of using the tensile/compression tester, we decided to use weights from RIT's fitness center. After requesting to use their facilities, the associate director of recreation, Jennifer Lewis, allowed us to use her facilities.

Step Two: Rewrite the Test Plans

As we changed the way we did the testing, we needed to change the test plan. The new test plan was is available here: Test Plan

Step Three: Create Testing Components

In order to make sure that the weights would easily be held in place, we needed to make a stand for them to rest on. Using some scrap metal from the shop, we were able to create this!

public/MSD II\Integrated System Build and Test\Photos\TestPiece.jpg

Step Four: Test

Jennifer Lewis and our team agreed that we can use the facilities on 3/11/16, 3/15/16, and 3/16/16.

public/MSD II\Integrated System Build and Test\Photos\JoeTesting.jpg

public/MSD II\Integrated System Build and Test\Photos\NickTesting.jpg

public/MSD II\Integrated System Build and Test\Photos\TestSetUp.jpg

Photos of our test set up

public/MSD II\Integrated System Build and Test\Photos\WeighingWeights.jpg

How we weighed the plates

Test Results

Test Plan Data Sheets

Setting up For Final Test Procedure

Acquiring a Hydraulic Pump

Many ideas were tossed around in how to obtain a pump including:

Our final solution was to purchase a brand new pump.

Jack Set with Extenders and Pryers

Creating the Work Piece

As part of our project, we needed to modify a work piece so that we can attach the ball joint to the machine. Here is the drawing for the workpiece:Work Piece Drawing

public/MSD II\Integrated System Build and Test\Photos\Workpiece.jpg

Updated BOM

public/Project Management/Purchasing/BOM-MSD2-PHASE3.PNG

Risk and Problem Tracking

Team Schedule

Plans for next phase

Team Objectives

Peter's Objectives

Vince's Objectives

Adel's Objectives

Nick's Objectives

Joe's Objectives

Lessons Learned and Peer Review Discussion


Project P16665 Work Breakdown
Requirements Definition Test Analysis Documentation Project Management Academic
Project Readiness Package

Project Summary

Project Description

Customer Requirements

Engineering Requirements

Test Plan and Summary Matrix

Test Plan Data Sheets

Test Results

Mechanical Simulations BOM

Functional Decomposition

Flow of Concept Selection

Subsystem Architecture

Drawing Package

Poster

Tech Paper

Operators Manual

Risk Management

Problem Solving

MSD I Project Schedule

MSD II Project Schedule

Values and Norms

POs

Gate Review

All items highlighted in red are not yet completed.


MSD I & II MSD I MSD II

Home

Project Management

Project Photos and Videos

Imagine RIT

Problem Definition

Systems Design

Subsystem Design

Preliminary Detailed Design

Detailed Design

Build & Test Prep

Subsystem Build & Test

Integrated System Build & Test

Integrated System Build & Test with Customer Demo

Customer Handoff & Final Project Documentation