P16680: AATech Universal Oil System
/public/

Build & Test Prep

Table of Contents

Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

Team Vision for Build & Test Prep Phase

Test Plan Summary

Risk and Problem Tracking

Design Review Materials

Power Distribution Testing

Top Level Circuit for End of Line Build

Images from Power Distribution Testing

Images from Door Interlock Test

http://edge.rit.edu/edge/P16680/public/Build%20and%20Test%20Prep%20Documents/DoorClose.png

Knowledge Gained

  1. Order more wire/tubing then initially necessary in order to account for calculation error
  2. Double check wire gauge, sizing depends on voltage needed and different gauges are necessary for large systems
  3. Understanding different circuit diagrams from different manufacturers
  4. Testing via new means

Control System Communication Setup/Testing

Control System Communications Initial Setup

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation