P16682: AATech GE90 Tube Trim
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

All template text must be removed prior to your Final Demo and Handoff

Team Vision for Final Demo and Handoff

Summarize:

Test Results Summary

Summarize test results and assess effectiveness of test plans to unambiguously demonstrate satisfaction of the engineering requirements. Include photos and videos as appropriate

Inputs & Source

  1. Test Plan
  2. Results of system integration

Outputs & Destination

  1. Test Results
  2. Final documentation: paper, poster, manuals

Risk and Problem Tracking

Final Project Documentation

Functional Demo Materials

Include links to:

Plans for Wrap-up


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation