P17007: Motor-Assisted Wheelchair 2.0
/public/

Detailed Design

Table of Contents

Team Vision for Detailed Design Phase

During this phase we plan to...

During this phase we accomplished...

Progress Report

Prototype and Drawings

Isometric Top Left View

Isometric Top Left View

Rear Attached View

Rear Attached View

Rear Unattached View

Rear Unattached View

Right Attached View

Right Attached View

Right Unattached View

Right Unattached View

Top Attached View

Top Attached View

Top Unattached View

Top Unattached View

Attachement Bracket Print

Attachement Bracket Print

Bottom Plate Print

Bottom Plate Print

Side Bracket Print

Side Bracket Print

Weight Calculation with Exploded View

Weight Calculation with Exploded View

P17007 Wiring Diagram

P17007 Wiring Diagram

Flowcharts and Requirements

P17007 System Flowchart

P17007 System Flowchart

P17007 Customer and Engineering Requirements Chart

P17007 Customer and Engineering Requirements Chart

P17007 Spec Sheet

P17007 Spec Sheet

Bill of Material (BOM)

P17007 Final Bill of Materials

P17007 Final Bill of Materials

The following items will be reused from team P16007...

Bill of Materials - Live Document

Test Plans

P17007 Test Plan - Noise

P17007 Test Plan - Noise

P17007 Test Plan - Noise

P17007 Test Plan - Noise

P17007 Test Plan - Noise

P17007 Test Plan - Noise

P17007 Test Plan - Ease of Application

P17007 Test Plan - Ease of Application

P17007 Test Plan - Maximum Incline

P17007 Test Plan - Maximum Incline

P17007 Test Plan - Minimum Turning Radius

P17007 Test Plan - Minimum Turning Radius

P17007 Test Plan - Maximum Distance

P17007 Test Plan - Maximum Distance

P17007 Test Plan - Max Speed

P17007 Test Plan - Max Speed

P17007 PWM Interface

P17007 PWM Interface

Risk Assessment

P17007 Risk Assessment

P17007 Risk Assessment

Risk Assessment - Live Document

Design Review Materials

Detailed Design Review Notes

Plans for next phase

Team Vision for First Phase of MSD II:

Individual Plans for Next Phase:

Individual Plans for Next Phase

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation