P17012: Energy Absorbing Knee Brace
/public/

Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

Team goal was to complete subsystem build of Hinge device, and show forward movement with electronics design.

Subsystems

Design Pick

Design Pick

Hinge Design

public/Detailed Design Documents/CAD/Drawing PDFs/MetalDesign.png

Design 1 New Component Drawings

STRUT, FLAT

STRUT, FLAT, POT POCKET

STRUT, TENSION, FLAT

HOUSING, METAL

MOUNT, TUNER

Electronics

The electronic subsystem design has not changed since the previous phase, but implementation of the design has been slower than expected. Several subject matter experts are being consulted on the issues experienced by the team. These problems are outlined in the Problem Tracking document below.

The following blockages have been identified:

The following remedies are in the process of being implemented in order to address the aforementioned blockages.

The following subsystem components have been delayed due to the blockages:

The subsystem will continue to be developed pending discussion and review by the customer and guide to address possible alternatives to keep the project on track. The subsystem delivered for this phase will be the older version of the subsystem (NetDuino + BT UART module.)

Preliminary Testing Plan

Engineering Requirements to be preliminarily tested

Risk and Problem Tracking Updates

Risk Management

Problem Tracking

Plans for next phase

Three Week Plan

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation