P17044: Human Tremor Mitigation
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

Customer Handoff Update

Link to Document here

Goals for Week 15

Beta

  1. Complete Beta ER Testing (complete)
  2. Adjust control algorithm to function with 4 Electromagnets and 2 9DOFS (Added 1 9DOF, complete)
  3. Documentation (complete)
  4. Create documents to lay out rationale for build decisions (complete)
  5. Create "Next Steps" document (complete)
  6. Create Comparison Document (Alpha vs Beta) (complete)

Logistical

  1. Present at Access Tech Conference (complete)
  2. Print Access Poster (complete)

Imagine

  1. Do an Imagine simulation (complete)
  2. Compile information and make hand outs with team member information to hand out (incomplete)

Paper Work

  1. Finish Paper initial draft (complete)
  2. Have editor go through paper and fix continuity issues (in progress)

Test Results Summary

Engineering Requirements With Test Results

Engineering Requirements With Test Results

Customer Requirements With Results

Customer Requirements With Results

Link to Document here

Risk and Problem Tracking

Risks

Risks

Link to Document here

Problem Tracking

Problem Tracking

Link to Document here

Imagine RIT and Access

Imagine RIT

Imagine Pic1

Imagine Pic1

Imagine Pic2

Imagine Pic2

Imagine Fixture Video

Imagine Fixture Video

Imagine Pic3

Imagine Pic3

Link to Destler's Challenge Video (https://www.facebook.com/ImagineRIT/videos/10154622075720829/)

Access Tech

Access Pic

Access Pic

Acknowledgements and Accolades

Final Project Documentation

Link to Bill of Materials MSD II Customer Handoff/BOM_per_build_V5.xlsx

Link to ContactsMSD II Customer Handoff/Access Technology Conference.docx

Link to Simulated Use CaseMSD II Customer Handoff/Simulated Use Case .docx

Link to Rationale For Decisions doc forP18044/Rationale For Decisions

Link to Recommendations for Future Team doc forP18044/Recommendations for Future Team

Link to Alpha vs. Beta doc here

Link to Assembly doc forP18044/AssemblyDocument.docx

Functional Demo Materials

Link to Pre-read here

Plans for Wrap-up


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation