Table of Contents
|
Team Vision for Final Demo and Handoff
- Fix failures from testing before Imagine RIT
- Present at Imagine RIT
- Prepare and present end of year 90 second slide
- Prepare for future teams working on problems
- Prepare for customer hand off
Test Results Summary
The updated Testing Plan can be downloaded below. All official testing has been completed and problems that require additional work have been identified. The additional fixes have been started and are about 50% complete. We are expecting to have all problems solved by mid-next week.Completed Test Plans (11MAY17)
Instructions
All current assembly instructions are shown below. Sub-Assemblies that require factory assembly (Soldering, machining, etc.) are not shown as the customer would not assemble these.Assembly Instructions (11MAY17)
Software
Below are links to the Arduino code for the device as well as a timing diagram to assit in testing and trouble shooting.Purchasing
An updated BOM is linked below:- All purchasing and returns for the current design is complete.
- Purchase of additional parts to fix identified problems is pending.
Risk and Problem Tracking
Current Risks and Problem Tracking are linked below:Problem Tracking Chart (11MAY17)
Current Risk Management (11MAY17)
Final Project Documentation
Current Technical Report (11MAY17)
Plans for Wrap-up
- Prepare documents for handover to Joe
- Evaluate team performance
Home | Planning & Execution | Imagine RIT
Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design
Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation