P17046: The Overcomer - Lower Extremity
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

Test Results Summary

The updated Testing Plan can be downloaded below. All official testing has been completed and problems that require additional work have been identified. The additional fixes have been started and are about 50% complete. We are expecting to have all problems solved by mid-next week.

Completed Test Plans (11MAY17)

Instructions

All current assembly instructions are shown below. Sub-Assemblies that require factory assembly (Soldering, machining, etc.) are not shown as the customer would not assemble these.

Assembly Instructions (11MAY17)

Software

Below are links to the Arduino code for the device as well as a timing diagram to assit in testing and trouble shooting.

Final Code (11MAY17)

Purchasing

An updated BOM is linked below:

Current BOM (11MAY17)

Risk and Problem Tracking

Current Risks and Problem Tracking are linked below:

Problem Tracking Chart (11MAY17)

Current Risk Management (11MAY17)

Final Project Documentation

Current Technical Report (11MAY17)

Poster Design (11MAY17)

Final Requirements (11MAY17)

Plans for Wrap-up


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation