Team Vision for Integrated System Build & Test Phase

During this Phase:

Project Status

Drawings can be found in the private section of the MSD folder directory.

Instructions

All current assembly instructions are shown below. Sub-Assemblies that require factory assembly (Soldering, machining, etc.) are not shown as the customer would not assemble these.

Current Assembly Instructions (22MAR17)

Purchasing

An updated BOM is linked below:

Current BOM (22MAR17)

Testing Plan

The updated Testing Plan can be downloaded below. No official testing has been completed due to the recent completion of assembly but all subsystems have been tested and modfied as needed to complete integration.

Current Test Plans (22MAR17)

Software

Below are links to the Arduino code for the device as well as a timing diagram to assit in testing and trouble shooting.

Current Code (22MAR17)

Imagine RIT/End of Year

The current propsal (for reference), technical report and poster design can be seen below:

Imagine RIT Proposal (22FEB17)

Current Technical Report (22MAR17)

Current Poster Design (22MAR17)

Risk and Problem Tracking

Current Risks and Problem Tracking are linked below:

Problem Tracking Chart (22MAR17)

Current Risk Management (22MAR17)

Plans for Next Phase

MSD II Phase III Plan

MSD II Phase III Plan

Closson Plan

Fenn Plan

Murphy Plan

Constant Plan

Maher Plan


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation