P17046: The Overcomer - Lower Extremity
/public/

Integrated System Build & Test with Customer Demo

Table of Contents

Team Vision for System Level Demo with Customer

During this Phase:

Project Status

Drawings can be found in the private section of the MSD folder directory.

Test Results Summary

The updated Testing Plan can be downloaded below. All official testing has been completed and problems that require additional work have been identified. The additional fixes have been started and are about 50% complete. We are expecting to have all problems solved by mid-next week.

Completed Test Plans (19APR17)

Instructions

All current assembly instructions are shown below. Sub-Assemblies that require factory assembly (Soldering, machining, etc.) are not shown as the customer would not assemble these.

Current Assembly Instructions (19APR17)

Software

Below are links to the Arduino code for the device as well as a timing diagram to assit in testing and trouble shooting.

Final Code (19APR17)

Purchasing

An updated BOM is linked below:

Current BOM (19APR17)

Imagine RIT/End of Year

The current proposal (for reference), technical report and poster design can be seen below:

Imagine RIT Proposal (22FEB17)

Current Technical Report (19APR17)

Current Poster Design (19APR17)

The technical report is 75% complete at this time. The poster is complete and awaiting peer and instructor feedback before final re-submittal next week.

Risk and Problem Tracking

Current Risks and Problem Tracking are linked below:

Problem Tracking Chart (19APR17)

Current Risk Management (19APR17)

Plans for Next Phase

MSD II Phase III Plan

MSD II Phase III Plan

Closson Plan

Fenn Plan

Murphy Plan

Constant Plan

Maher Plan


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation