All documents for the Build & Test Prep Phase can be found here

MSD I Post Mortem

Outcomes

What worked well?

What can We improve on?

Team Vision for Build and Test Prep Phase

Goals for MSD II Phase 1

  1. feasibility analysis: stress on attachment
  2. feasibility analysis: stress on components
  3. design of prototype attachment (frame to wheelchair) solidified
  4. design of prototype attachment (device to frame) solidified
  5. CAD model for attachment frame complete
  6. CAD drawings for attachment frame complete
  7. model of full assembly
  8. intended use documents written
  9. 3D printed parts requests sent out
  10. begin assembly of subsystems
  11. almost all purchasable parts on order
  12. complete project plan to outline MSD II
  13. risk management document updated
  14. problem matrix created and tracked
  15. EDGE documentation updated
  16. system architectures updated
  17. all CAD models updated to represent systems accurately
  18. CAD drawings completed for machined parts
  19. machined parts completed
  20. initial assembly instructions written for each subsystem
  21. fabrication procedure/tooling and jigs developed
  22. finalized bill of material for entire system
  23. testing plan complete
  24. documentation of design changes since MSD I
  25. Mary Cariola facility tour
  26. update budget sheet
  27. Imagine RIT exhibit description and proposal written

What did we accomplish?

  1. design of prototype attachment (frame to wheelchair) solidified
  2. design of prototype attachment (device to frame) solidified
  3. almost all 3D printed parts requests sent out
  4. some purchasable parts on order
  5. complete project plan to outline MSD II
  6. risk management document updated
  7. problem matrix created and tracked
  8. EDGE documentation updated
  9. system architectures updated
  10. all CAD models updated to represent systems accurately
  11. CAD drawings completed for machined parts (except for attachment frame)
  12. initial assembly instructions written for each subsystem
  13. finalized bill of material for entire system
  14. testing plan complete
  15. documentation of design changes since MSD I
  16. update budget sheet
  17. Imagine RIT exhibit description written

CAD Drawings

Net End Cap

Net Plunger

Net Frame

Net Barrel

Net Frame Ring

Lever Al Housing Top/Bottom Drawing

Lever Al Housing Spacer Drawing

Lever Al Housing Gear Shaft Drawing

BOM

Combined Bill of Materials

Updated Engineering Requirements

Engineering Requirements Rev 6

What's the Gap?

  1. feasibility analysis: stress on attachment
  2. feasibility analysis: stress on components
  3. CAD model for attachment frame complete
  4. CAD drawings for attachment frame complete
  5. model of full assembly
  6. intended use documents written
  7. begin assembly of subsystems
  8. machined parts machined
  9. fabrication procedure/tooling and jigs developed
  10. Mary Cariola facility tour
  11. Imagine RIT exhibit proposal written

How do We Fill the Gap?

  1. CAD model simulation for stress; benchmarked clamps' load capacity; testing
  2. failure testing on components we've marked as high risk (i.e. ring gear on lever)
  3. finalize structure of attachment frame based on stress analysis;
  4. complete drawing based on CAD model; machine frame at Harabec
  5. combine all CAD subsystems into full system for presentation purposes
  6. create detailed intended use instructions involving which games to play, how to attach devices, number of people participating, etc.
  7. as soon as all parts are in begin assembly for testing immediately
  8. Friday, February 10 machine lever Aluminum housing
  9. research methods of fabrication and begin documentation
  10. Tuesday, February 14 tour is planned for team
  11. proposal written by team by end of February

Design Changes Since End of MSD I

General

public/Photo Gallery/atom clamp.jpg
public/Photo Gallery/flagpole.jpg
public/Photo Gallery/bracket.jpg
Bracket Assembly

Catch/Launch Subsystem

Assembly Instructions Rev 1

public/Photo Gallery/catchSA.jpg
public/Photo Gallery/barrel1.jpg
public/Photo Gallery/net1.jpg

Striking Subsystem

Assembly Instructions Rev 1

public/Photo Gallery/base.jpg
public/Photo Gallery/plate.jpg
public/Photo Gallery/spacer.jpg
public/Photo Gallery/shaft.jpg
public/Photo Gallery/ringgear.jpg

Test Plan Summary

User Testing

Test Plans at End of MSD I

Updated Test Plans for MSD II

Budget Analysis

Purchasing

Purchasing

Risk and Problem Tracking

Risk Assessment

public/Photo Gallery/risks8.jpg

Risk Assessment Tracking

Problem Tracking

public/Photo Gallery/problems.jpg

Plans for Next Phase

Gantt Chart

public/Photo Gallery/nGantt2.jpg

Team Goals

Individual Contributions

Hannah

Robert

Amy

Liz

Emma

Jamie


Home | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation