Team Vision for Integrated System with Customer Demo

Goals for MSD II Phase 4

  1. feasibility analysis: physical testing for failure modes of components
  2. begin physical testing feasibility with team members
  3. CAD model for attachment frame complete
  4. CAD drawings for attachment frame complete
  5. model of full assembly
  6. intended use documents written
  7. full assembly of subsystems
  8. develop Imagine RIT layout (who, what, when, where, how)
  9. assembly instructions finalized for all subsystems
  10. project plan updated
  11. risk management updated
  12. problem matrix updated
  13. EDGE updated
  14. document design changes (ongoing)
  15. assembly of subsystems
  16. finalize BOM
  17. update budget documentation

What did we accomplish?

  1. machined and 3D printed components for each subsystem
  2. updated all CAD models and drawings to reflect design changes
  3. draft Imagine RIT poster
  4. draft technical paper
  5. assembly instructions finalized for cannon subsystem
  6. project plan updated with critical path called out
  7. risk management updated
  8. problem matrix updated
  9. EDGE updated
  10. document design changes
  11. finalized BOM
  12. updated budget documentation

Team self-assessment

Draft technical paper

Prototype Subsystems Build and Assembly

Catch and Launch Subsystem

public/Photo Gallery/C1.jpg public/Photo Gallery/C2.jpg public/Photo Gallery/C3.jpg public/Photo Gallery/C4.jpg
public/Photo Gallery/C5.jpg public/Photo Gallery/C6.jpg public/Photo Gallery/C7.jpg public/Photo Gallery/C800.jpg

Functional Demo Materials

Updated test plans as of 4/20/17

BOM

Full System Bill of Materials

Budget Analysis

Expenditures Updated as of 4/20/17

Risk and Problem Tracking

Risk Assessment

public/Photo Gallery/risks8921.jpg

Risk Assessment Tracking

Plans for Next Phase

Gantt Chart

public/Photo Gallery/nGantt21.jpg

Team Goals

Individual Contributions

Hannah

Robert

Amy

Liz

Emma

Jamie


Home | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation