P17062: Keller's Kats Cart
/public/

Build & Test Prep

Table of Contents

Team Vision for Build & Test Prep Phase

The Build and Test Prep phase was envisioned to be used to finish the last few documents and testing plans in preparation for the commencing of the major leg of testing and prototype refinement. This includes:

Test Plan Summary

Because we began our testing during phase I, our test plan is geared to finalize our design and better quantify our testing metrics. Each subsystem is separated to better evaluate each one objectively relative to our Engineering Requirements. This can be viewed by examining the Excel file below, which outlines each subsystem and the quantify-able metrics we will be examining. Test Plan as of 2/1/2017

The image below is a list of anticipated test dates and expectations.

 Tentative Testing dates for MSD II as of Build & Test prep review

Tentative Testing dates for MSD II as of Build & Test prep review

A quick test form was created to evaluate the overall performance of a specific iteration of the cart.

Testing Metrics Form

MSD II Planning

An overall plan for MSD II was created to better assist the team in meeting desired goals for specific project review deadlines. The plan outlines specific iterations for testing, desired time frame for completion of specific subsystems, and tasks required for completion of the project.

Tenative plan for MSD II as of Build & Test Prep review

Tenative plan for MSD II as of Build & Test Prep review

Tentative MSD II plan as of Build & Test Prep review

Individual Plans

Each team member created an individual plan for the week 5 review in order to better complete individual tasks and goals.

Mattheiu Dora Individual Plan

Sarah Stoltzfus Individual Plan

Colin Lemen Individual Plan

Jeff Wayman Individual Plan

Risk and Problem Tracking

Risk Management

Risk Assessment as of Build & Test Prep review

Risk Assessment as of Build & Test Prep review

Problem Tracking.

Problem Tracking as of Build & Test Prep review

Problem Tracking as of Build & Test Prep review

DDR Presentation Action Items

All of these action items are intended to be completed before the week 5 review of MSD II.

Plans for Next Phase

Test Plan as of 2/1/2017


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation