P17080: Heart Pump and Circulatory System
/public/

Integrated System Build & Test

Table of Contents

Review of Action Items

Review of Action Items

Review of Action Items

Accomplishments

Combined Bill of Materials

See the combined bill of materials here Updated BOM

Test Results Summary

At the beginning of this phase a detailed test plan was generated. The two conducted during this phase were Solenoid Frequency Testing and Input Pressure Regulation Testing.

Solenoid Frequency Testing

Flow Chart

Solenoid Frequency Testing Flow Chart

Solenoid Frequency Testing Flow Chart

Data

Solenoid Frequency Testing Data

Solenoid Frequency Testing Data

Conclusions

This testing was informally done last semester. The formal testing was completed in this phase.The solenoid continued to function for the entire duration of this testing. The testing heart beat frequency began 10 BPM below and ended 10 BPM above the range. This ensures that the solenoid can perform above the desired requirements.

Input Pressure Regulation Testing

Flow Chart

Solenoid Frequency Testing Flow Chart

Solenoid Frequency Testing Flow Chart

Data

Raw Data for Both Ranges

Raw Data for Both Ranges

Inlet Pressure Variation Range 0V to 3V

Inlet Pressure Variation Range 0V to 3V

Conclusions

The testing was determined to require additional testing. The change in the lower value is due to the sensor drift in the Pasco Sensor. The fluctuation in the data show that additional testing on the hardware needs to be done. The possibility of adding a capacitor could dampen the noise and allow the regulation to be more accurate.

All Testing

See all test data here TestData

Additions to System

Over Vacuum Switch

Details can be seen in the problem matrix under problem 2 Vacuum Pressure Balance. The hardware was found in the MSD surplus and attached to the system to vent excessive vacuum to avoid over inflation.

Over Vacuum Switch

Over Vacuum Switch

Relocation of Blow-Off Valve

The relocation of the blow off valve was an adaptation because of the over vacuum switch. The new best location was using a pressure line to the box for the blow-off valve.

Tubing to Blow-Off Valve

Tubing to Blow-Off Valve

Problem Tracking

There were no added criticle problems:

There was one added major problem:

There were six added common problems:

Updated Problem Matrix

Updated Problem Matrix

Updateed Problem Tracking

Updateed Problem Tracking

See Problem Matrix here: Updated Problem Matrix

Build Progress

Tanks

Both of the first two plates have been machined. The rods were cut to size then the cylinder was cut to size. They were fitted together with minor tolerance adjustments. The tank to atmosphere was altered to have a larger hole in it. This is so that a plastic capped pipe can be inserted into it to assist with adjusting the preload.

Updated Second Tank Lid

Updated Second Tank Lid

First Tank Assembly

First Tank Assembly

Second Tank Assembly

Second Tank Assembly

See tank drawings here: Updated Tank Drawings

First Tank Lids

First Tank Lids

Assembled First Tank

Assembled First Tank

Current Circulatory System

Current Circulatory System

Overall System

The electrical system was organized to make it easier to troubleshoot.

Current Electrical Layout

Current Electrical Layout

The heart pump seal was converted from silicone tape to an O-ring because the silicone tape was not easy to obtain. Also, it needs to be replaced more often than the O-ring would. The O-ring currently is difficult to place since there was no indent machined for it's placement. It is currently being discussed if the team wants to machine an indent at this time.

Current Heart Pump

Current Heart Pump

Plans for next phase

Schedule Review

Previous Schedule

Previous Schedule

Updated Schedule

Updated Schedule

See Updated Schedule here: Updated Schedule

Three Week Plan

Henry

Mike

Blake

Kevan

Susan


Home | Planning & Execution | Imagine RIT