Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

We focused on finishing up all of our documentation to hand off to our customer.

Goals for this phase:

Accomplishments:

Risk and Problem Tracking

The risks and problem tracking were last updated less than a week ago for the "Integrated System Build & Test with Customer Demo" review, so they have not changed.

Risk Management

Risk Management

Risk Management

The risk management document can be found here.

Problem Tracking

Here is our updated problem tracking table:
Problem Tracking Table

Problem Tracking Table

Here is a pie chart with our updated progress on these problems:

Problem Tracking Wheel

Problem Tracking Wheel

The updated working document can be found here.

Self Assessments

Performance vs Requirements

Team self assessment of the project performance/results against our engineering requirements: Performance vs Requirements PDF

The working document is here: Performance vs Requirements Word Doc

Norms and Values

Team self assessment against norms and values: Norms and Values Assessment PDF

The working document is here: Norms and Values Assessment Word Doc

Pictures and Videos

Pictures and videos from the development of the project can be found here: Development Pictures and Videos

A time lapse of pictures from the platform during launch can be found here: Launch Timelapse

A video of the actual launch can be found here: Launch Video

A video of all of the platform video stitched together can be found here: Flight Video

Pictures and videos from launch day can be found here: Launch Day Pictures and Videos

Pictures from the platform during the flight can be found here: Pictures from the Platform

Videos from the platform during the flight can be found here: Videos from the Platform The platform took video for 60s, then a few pictures, over and over again.

Pictures of the recovered platform can be found here: Recovered Platform Pictures

Here are some of the images from the platform from the launch:

Rochester Airport from our Platform

Rochester Airport from our Platform

Earth from our Platform

Earth from our Platform

Landfill Facility our Platform Landed at

Landfill Facility our Platform Landed at

Launch Results

See the DAQCS page for their results and data.

Logs from the Pi Zero can be found here: Pi Launch Logs

Logs from the ground station can be found here: Ground Station Logs

Tracking from the GPS data can be found here: GPS Path Tracking

A log of the APRS data from aprs.fi can be found here: APRS Log

Comms Sensor Data

This section has graphs of the sensor data that was stored on the on-board microSD card.
Pi Zero Die Temperature Sensor

Pi Zero Die Temperature Sensor

Custom PCB Temperature Sensor

Custom PCB Temperature Sensor

Pressure Sensor

Pressure Sensor

GPS Sensor - Altitude

GPS Sensor - Altitude

The GPS module cut out above 12,000m due to it being in the wrong operating mode (software issue).
GPS Sensor - Speed

GPS Sensor - Speed

The above graph is the horizontal speed from the GPS module. No new values were obtained above 12,000m since the GPS module cut out.
Vertical GPS Velocity

Vertical GPS Velocity

The GPS altitude data was taken and used to calculated the vertical velocity of the platform; a graph of the calculated data is shown above.

The data and graphs of the COMMS sensor data can be found in this excel spreadsheet.

Final Project Documentation

This is a compilation of all final documentation.

Technical Paper

Link to final paper: P17104 and P17105 Combined Technical Paper

The working document: P17104 and P17105 Combined Technical Paper Word Doc

Final Poster

Link to final poster: Imagine RIT Poster

Bill of Materials

The main COMMS BOM can be found here: COMMS BOM PDF

The working document can be found here: COMMS BOM Spreadsheet. Custom PCB components appear as line items and can be found in the separate custom PCB BOM. Some items were also needed for P17104 that were purchased by P17105; there is a separate tab in the BOM for those items.

The custom PCB BOM (referenced as a line item in the main BOM) can be found here: Custom PCB BOM

The following 2 images show a high level breakdown on what areas the purchases were in:

COMMS Purchases Pie Chart

COMMS Purchases Pie Chart

COMSM Purchases Percentage Breakdown

COMSM Purchases Percentage Breakdown

Mechanical Documents

The HAB Assembly Guide: HAB Assembly Guide

Drawing Directory: Final Documents/CAD/Final Files/

Electrical Documents

Software Directory: Final Documents/Software

A guide for setting up the COMMS Pi Zero can be found here: Pi Setup

The soundmodem running on the Pi Zero was modified to trigger our push to talk GPIO during transmission (beacon command). There is code to run at the ground station (Linux box in Meteor Lab connected to the VHF/UHF transceiver) to log and plot received data and to send commands.

A guide for setting up Soundmodem can be found here: AX25 Setup Guide

A guide for setting up the APRS can be found here: APRS Setup Guide

Documentation was created to define the interfaces between systems. Here it is: Interface Documentation

An image of the MicroSD card contents that were launched for the COMMS Pi Zero can be found here: Pi Image (1.1GB)

The final custom PCB schematic can be found here: Main COMMS Board Schematic

The final custom PCB BOM can be found here: Main COMMS Board BOM

The final custom PCB gerbers can be found here: zipped gerbers

The generated plots by Advanced Circuits (board manufacturer) can be found here: Advanced Circuits Plots

We developed our custom PCB hardware with P17105 in a GitHub repository. Here is a zip file of all that work: Eagle GitHub Repository

Presentation

The teams (P17104 and P17105) have lightning talks (90 seconds each) on 5/11/17. We made one presentation for both teams. The working slides are here.

Post-mortem

Lessons learned and ideas for future work and improvements: here

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation