P17214: Smart Mountain Bike Suspension
/public/

Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

During this phase, we received all the components of our project and proceeded to test and start building. We tested the lidar's capabilities and found that it will be able to

lidar works through the lense, build the power board, machine and printed a lot of the mounts,

Test Results Summary

We started to move forward with some of the component level testing once we received the parts from Digikey. We were able to test the servos, the power control board, and display. On the mechanical side, we were able to get the rear servo mount machined out of aluminum. The test plan overview is shown below. It shows all of the test plans we have so far and their status. To view the test results, refer to the live document which will be linked below.

Test Plan Overview

Test Plan Overview

A link to the live document containing the Problem Tracking Chart here

Risk and Problem Tracking

The newest and major problem we are having is working with the Construct to get the PCB machine working so we can get a PCB of the power control board. Additionally, the Arduino IDE stopped working for about a week. This prevented us from moving forward with the lidar and accelerometer testing.

Problem Tracking Chart

Problem Tracking Chart

A link to the live document containing the Problem Tracking Chart here

Plans for next phase

MSD2 Phase 3 Schedule

MSD2 Phase 3 Schedule

Above is the Updated Semester Schedule as of 10/4/2017. The Gantt-Chart is broken up into three different sections. Mechanical, Electrical, and Computer engineering tasks. This is how we keep our individual tasks straight.

Each member of the team has mapped out their goals and tasks for the next three week phase of the MSD 2 project. Individual plans are listed below


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation