P17221: FSAE Composite Tube Fabrication
/public/

WBS_Risk_Analysis

Problem Tracking

Problem Tracking Pg 1

Problem Tracking Pg 1

Problem Tracking Pg 2

Problem Tracking Pg 2

Color codes for Problem Tracking:

Gray:no longer relevant

Green: recently completed

Orange: current progress of active problem

Red: active problem processes which still need completion

Risk Analysis

Risk Management Table

Risk Management Table

The sum of the risk table is currently 30.5.

Risk Mitigation Plot

Risk Mitigation Plot


Home | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integraged System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation

Admin Mechanical Design Electrical Design Assembly/Integration Documentation

Requirements

Planning

Costing

Risk Analysis

Feedback

Feasibility Analysis

Design & Validation

3D Model

Hardware

Prints

Feasibility Analysis

Design & Validation

Hardware

Software

Machining

Mechanical Integration

Electrical Integration

Test Plans

Final Live Documents

Imagine Poster

User Manual