P17310: RIT Observatory Telescope Dome Controls
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Hand-off:

Test Results Summary:

Test Results

Problem Tracking:

Click here for information related to the continuation of the Latch Arm Mechanism prototype development.

Final Project Documentation:

Copy of Final Code

Final Code Version 1.1

Final User Guide

Final PDF Document: User Guide

Final Latex Zip File: Latex zip File

3-D Printed Files in STL Format:

STL 3-D Printed Files: STL Files

Latch Torque Arm Drawings:

Latch Arm Drawing Files: Drawing Files

2017 Imagine RIT:

Imagine RIT Poster:

public/Imagine RIT Exhibit/Imagine Poster.jpg

Imagine RIT Exhibit:

public/Imagine RIT Exhibit/Imagine Table.jpg

4X Speed of LabView Demo Video taken at the Observatory:

public/Imagine RIT Exhibit/4X speed .gif

Latch Mechanism Setup:

public/Imagine RIT Exhibit/Imagine_Set_Up.png

Demo Schematic:

public/Imagine RIT Exhibit/Imagine_Demo_Schematic.png

Latch Mechanism Demo:

public/Imagine RIT Exhibit/Imagine_Demo.gif

Screenshot of Data From Latch Mechanism Demo:

public/Imagine RIT Exhibit/Imagine_RIT_Demo_Capture.PNG

Arduino Code for Imagine RIT Demo:

Code for Control Box Arduino

Code for Push Buttons Arduino

Latch Arm Control Box Detailed Summary:

Latch Arm Control Box Detailed Summary

Final LabView Interface:

Screenshot of Interface:

public/Final Documents/frontpanel.JPG

The interface allow for easy entry of RA/DEC coordinates to allow the dome to track a stellar target. Indicator lights provide a status of the system and warns the user when and issue may arise with the RA/DEC coordinates they entered.


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation