P17310: RIT Observatory Telescope Dome Controls
/public/

Integrated System Build & Test with Customer Demo

Table of Contents

Team Vision for System Level Demo with Customer

Test Results Summary

Test Results


Latch Arm Build

public/Integrated System Build and Test/DEMO/IMG_20170416_122829564.jpg

Fully assembled latch arm metallic components

public/Integrated System Build and Test/DEMO/Stepper motor mount.PNG

Stepper Motor Mount

public/Integrated System Build and Test/DEMO/Stepper motor wire hook.PNG

Stepper Motor Wire Hook

public/Integrated System Build and Test/DEMO/Stepper motor wire feed.PNG

Stepper Motor Wire Feed Loop

public/Integrated System Build and Test/DEMO/Stepper motor spool.PNG

Stepper Motor Wire Spool


Build Notes:
Latch Arm Testing

public/Integrated System Build and Test/DEMO/Bluetooth.jpg

Bluetooth

public/Integrated System Build and Test/DEMO/Control Box.jpg

Control Box

public/Integrated System Build and Test/DEMO/Latch controls.png

Latch Controls

public/Integrated System Build and Test/DEMO/Latch mechanism Demop.jpg

Latch Demo Setup

public/Integrated System Build and Test/DEMO/Latch Demo.gif

Demo

public/Integrated System Build and Test/DEMO/Data_Plot.PNG

Data Results of Pressure Sensor Test

Pressure Sensor Test Results


LabView File

LabView code

Front panel has been redone for easier readability and basic shutter control has been added.

Instructions

User Manual Draft

Updates of the Latch Mechanism Control Box

Outside of Control Box

public/8_24_wkq/Latch Mechanism Control Box/alll side views.jpg

Outside of Control Box GIF

public/8_24_wkq/Latch Mechanism Control Box/Outside Box.gif

Updated Interior of Latch Mechanism Control Box

public/8_24_wkq/Latch Mechanism Control Box/Inside.jpg

12 Pin Connector Connections Located on the top of the Latch Mechansim Control Box

public/8_24_wkq/Latch Mechanism Control Box/12 pin connector table.PNG

Update of partially 3D printed updated Latch Arm

public/8_24_wkq/Latch Mechanism Control Box/Partial 3d print update.png

Risk and Problem Tracking

Plans for next phase

Ahmed Alhurubi's Three Week Plan: Ahmed's Goals

Joe Brescia's Three Week Plan: Joe's Goals

Raymond Castro's Three Week Plan: Ray's Goals

Wilson Quizhpi's Three Week Plan: Wilson's Goals

Sarah Williams's Three Week Plan: Sarah's Goals

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation