P17316: Light Rail
/public/

Integrated System Build & Test with Customer Demo

Table of Contents

Team Vision for System Level Demo with Customer

During this phase the team planned to focus on completing construction, preparing for Imagine RIT, and completing required documentation. Each portion of the project is nearing completion and we expect to be completely done and testing by the end of this phase.

Last phase, the team was set back slightly by long material lead times. This phase, most if not all materials have arrived and completing construction is possible.

Test Results Summary

Mechanical Tests

The dimensions of the brackets that have been machined to date were confirmed accurate.

Electrical Tests

30 LED circuits were connected in parallel. Each LED was tested for functionality by connecting a low frequency signal to the base of the BJT. All LED circuits were functional.

Software Tests

The program is now functional. The GUI is now functional. Testing is being done to ensure reliability.

Risk and Problem Tracking

Risk Management Documentation

public/Photo Gallery/RiskManagement4.JPG

Problem Tracking

public/Photo Gallery/ProblemTracking2.JPG750 px

The full problem tracking document is located in our directory.

Functional Demo Materials

Plans for next phase

The next phase will be preparation for customer hand-off and Imagine RIT.


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation