P17347: Active Noise Cancellation
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

Test Results Summary

Due to the requirement to work solely on the SPEA2 refactoring, no additional testing was performed after the Subsystem Build & Test phase. All results can be found on the linked page.

Outputs & Destination

The final poster can be found here Final Poster

The final paper can be found here Technical Report

Risk and Problem Tracking

The final problem tracking document can be found here Problem Tracking

The final risk management document can be found here Risk Management

Final Documentation

Due to the proprietary nature of the project final documentation can be found in the private section of the EDGE repository. Found here Zipped Documents

Future Work

More detailed break down in technical paper Technical Report


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation