P17347: Active Noise Cancellation
/public/

Integrated System Build & Test with Customer Demo

Table of Contents

Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

All template text must be removed prior to your System-Level Demo with Customer

Team Vision for System Level Demo with Customer

Summarize:

Test Results Summary

Summarize test results and assess effectiveness of test plans to unambiguously demonstrate satisfaction of the engineering requirements

Instructions

  1. Quantitatively summarize the capabilities, performance, throughput, and robustness of your subsystems as demonstrated by execution of the test plan. Document your testing with photos or videos in addition to test data.
  2. Evaluate how well the test plan was able to confirm satisfaction of system-level requirements
  3. Include snapshot of testing completed to date, and include link to live requirements and testing document

Inputs & Source

  1. Test Plan
  2. Results of Preliminary Integrated System Demo

Outputs & Destination

  1. Test Results
  2. Customer Handoff

Risk and Problem Tracking

Functional Demo Materials

Include links to:

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation