P17415: Human Powered Centrifuge
/public/

Integrated System Build & Test with Customer Demo

Table of Contents

Team Vision for System Level Demo with Customer

Three Week Plan

Three Week Plan

Link to the live document here

Schedule

Schedule

Link to the live document here

Poster First Draft

Poster First Draft

Poster First Draft

Link to the live document here

Test Results Summary

RPM Data Analysis

RPM vsTime

RPM vsTime

Test Duration Data Analysis

Fitted Model

Fitted Model

Fitted Model

Fitted Model

Link to the live document here Link to the live document here

Duration Prediction Interval (21-62 mins)

Duration Prediction Interval (21-62 mins)

Link to the live document here

Risk and Problem Tracking

Risk Management

Risk Management

Problem Tracking

Problem Tracking

Plans for next phase

Ashlynn's Three Week Plan

Ken's 3 Week Plan

Raven's Three Week Plan

Yuan's Three Week Plan

Cole's Three Week Plan


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation