P17415: Human Powered Centrifuge
/public/

Preliminary Detailed Design

Table of Contents

Team Vision for Preliminary Detailed Design Phase

Team Plan

Team Plan

Link to the live document here

Team Plan

Team Plan

Link to the live document here

Feasibility: Prototyping, Analysis, Simulation

Torque Calculations for new rotor

Torque Calculations for new rotor

Link to the live document here

Unloaded Current draw table and graph

Unloaded Current draw table and graph

Link to the live document here

Battery Charging Time

Battery Charging Time

Link to the live document here

Tests Per Charge Cycle

Tests Per Charge Cycle

Link to the live document here

CAD Model

Bucket Assembly

Bucket Assembly

Bucket Assembly ISO

Bucket Assembly ISO

Drawings, Schematics, Flow Charts, Simulations

System Architecture Concept

System Architecture Concept

Link to the live document here

Bill of Material (BOM)

Bill of Materials

Bill of Materials

Link to the live document here

Test Plans

Preliminary Test Plan

Preliminary Test Plan

Link to the live document here

Preliminary Test Plan Data Sheet

Preliminary Test Plan Data Sheet

Link to the live document here

Motor Success

Motor Success

Risk Assessment

Risk Management

Risk Management

Link to the live document here

Plans for next phase

Ashlynn's Three Week Plan

Cole's Three Week Plan

Yuan's Three Week Plan

Raven's Three Week Plan

what are you doing to help your team achieve these goals? (Use the individual 3-week plan template for this)


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation