Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

All template text must be removed prior to your Subsystem-Level Build & Test Review

Team Vision for Subsystem Level Build & Test Phase

Team Three Week Plan

Team Three Week Plan

Summarize:

Schedule

Schedule

Vibration Test

PWM and Speed Controller

PWM and Speed Controller

Vibration Test Results

Vibration Test Results

Test Results Summary

Schedule

Schedule

Schedule

Schedule

Link to Initial Test Data

Inputs & Source

  1. Test Plan
  2. Subsystem fabrication

Outputs & Destination

Risk and Problem Tracking

Risk Management

Risk Management

Risk Management

Risk Management

Risk Management

Risk Management

Functional Demo Materials

Housing Construction

Housing Construction

Centrifuge Construction

Centrifuge Construction

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

DEMO video: https://www.youtube.com/watch?v=fq_FA6iwV74

Plans for next phase

Ken's 3 Week Plan

Raven's 3 Week Plan

Ashlynn's Three Week Plan

Yuan's 3 Week Plan Cole's 3 Week Plan


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation