Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

All template text must be removed prior to your Integrated System-Level Build & Test Review

Team Vision for Integrated System Build & Test Phase

What team did:

Need to accomplish:

Test Results Summary

As of now, the only testing that we were able to complete was the total measurement of the system, making sure it fit with customer specifications. The total volume encompassed by the vermi-compost bin, with the entire box glued and sealed together, is 18.5" W, 24" H, and 49 14/16" L. The testing plan to measure this shown below.
 Measurements of System

Measurements of System

The next step will be to finished attaching the mechanism handle and then test the grating mechanism.

Risk and Problem Tracking

Risk Management Risk Management.
Risk Management

Risk Management

Plans for next phase

Jay Patel

Test Plan demo phase 1 Demo 3 Plan. (click here to download).


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation