Team Vision for Detailed Design Phase

During this phase, our plan was to answer any and all design questions that came up during the Preliminary Detailed Design review. Our goal was to present a design that is essentially ready to be implemented so that we can hit the ground running when we return for the Fall semester. We plan to work as needed over the summer as a couple team members will be local. We planned to have our BOM done and complete, to make the purchasing process easier over the summer/fall.

We have been able to answer most, if not all, outstanding design questions, pending the Detailed Design review of course. We have settled on various parameters such as pile size, modeling in the fall, and composition. The BOM is slightly behind schedule in terms of its comprehensiveness, but we are confident that it will not cause any further delay than we already account for in terms of long lead time items. We feel our design is in such a place that any further questions or issues that arise during the Detailed Design review will be able to be settled quickly and not have an impact on the Senior Design II project plan.

Prototyping, Engineering Analysis, Simulation

Attached are design level questions that have been answered and are based on analysis and mathematics:

Design Analysis

Attached are the power consumption calculations over a 24 hour period with varying duty cycles: Power Consumption

Power Consumption

Power Consumption

Drawings, Schematics, Flow Charts, Simulations

General Overview

General Overview

Soil Bed

Soil Bed

Front View

Front View

Heat Exchanger Design

Heat Exchanger Design

System Overview

System Overview

Electrical System Physical Drawing

Electrical System Physical Drawing

Attached are the Greenhouse Electrical Schematics. They include system power, gpio connections and jbox assembly: Electrical Schematics

MSP430 Program Flow

MSP430 Program Flow

Attached are the schematics for the Raspberry Pi Development: Raspberry Pi General Schematics

Attached are the schematics for the MSP430 LaunchPad Microcontroller: MSP430 General Schematics

Bill of Material (BOM)

Shown below is a snapshot of the budget/purchases to date. The full and working Bill of Materials can be found here: BOM
BOM

BOM

Test Plans

Our goal is to create a scaled down version of the system in the first few weeks upon returning to campus, in order to validate our system's functionality on a larger scale. Shown below is the document for our Model plans:
Model Plans

Model Plans

Testing Procedure for Pile

Testing Procedure for Pile

Attached are the working documents:

Test Plans

Compost Model Plans

Risk Assessment

Risk Management

Risk Management

The working Risk Management document can be found here: Risk Management

Plans for next phase

Shown Below are two screenshots of the Project Plan for the first 6 weeks of the Fall semester. This is what will be followed and adjusted for when we come back for Senior Design II:
Project Plan

Project Plan

Project Plan cont.

Project Plan cont.

Plans for Summer 2017

Attached are the plans for summer of 2017 for the electrical team: Electrical Summer Plans

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation