P17422: Continuous System for Black Solider Fly Composting
/public/

Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

During this phase, we planned to:

During this phase, we achieved the following:

Building Results Summary

Main Body Subsystem

Summary of subsystem fabrication:

HDPE Main Body Sheet Sizing w/ Dimensions

HDPE Main Body Sheet Sizing w/ Dimensions

Picture of final assembly:

Main Body Final Assembly

Main Body Final Assembly

Drawer Subsystem

Summary of subsystem fabrication:

Middle Connection Drawing

Middle Connection Drawing

Picture of current status:

Drawer Subsystem Current Status

Drawer Subsystem Current Status

Leachate Draining Subsystem

Lid Subsystem

Needs:

Idea 1: Materials:

Possible lid concept

Possible lid concept

Filter Subsystem

Pupae Collection Subsystem

Risk Management and Problem Tracking

Link to updated Risk Management

Risk Management

Risk Management

Link to updated Problem Tracking.

Problem Tracking

Problem Tracking

Purchasing and Pricing

Link to updated Purchasing and Pricing.

Purchasing and Pricing (updated 3/27/17)

Purchasing and Pricing (updated 3/27/17)

Gantt Chart

Link to updated Gantt Chart for Phase 4.

Gantt Chart for Phase 4

Gantt Chart for Phase 4

Team plans for next phase

Three Week Plans


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation