P17521: Kodak Dry Ink Station Coupling Test Bed
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

Fall Project Plan

Fall Project Plan

Below is the up-to-date tracking of all project expenditures. To date, P17521 has used only 54% of its budget.

Expenditure Tracking Spreadsheet

Test Results Summary

The below table summarizes the Engineering Requirements and Satisfaction of the fixture to noted requirements:

Engineering Requirements

Engineering Requirements

Summarize test results and assess effectiveness of test plans to unambiguously demonstrate satisfaction of the engineering requirements. Include photos and videos as appropriate

Risk and Problem Tracking

Risks were revisited following the past review, and some risks were in fact focused on, in terms of mitigation for reducing the importance factor:

Final Risk Management Update

Final Risk Management Update

Final Project Documentation

This project's final technical paper can be found here.

Below is the final poster currently on display at RIT:

Final Project Poster

Final Project Poster

The Photoshop file can be downloaded here.

Part Drawings

Future Work

The team recommends another senior design project in which the new team further minimizes the fixture system error, tests couplings currently on the market, and potentially designs a coupling with even lower motion degradation than the one currently in use. This project’s remaining funds (~$2000) would be more than adequate in accomplishing this goal.

Plans for Wrap-up


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation