Team Vision for System-Level Design Phase

The primary goals of this phase were to brainstorm concept designs for the coupling test fixture build, to systematically select a design for prototyping, and finally to review and research material relevant to the coupling test fixture design. All of this was accomplished, along with learning more about the resources available to us in cleaning out any DIS units in our possession, before bringing them to our workstation in the MSD lounge.
Phase 2 Project Plan

Phase 2 Project Plan

The live document can be found here

To the left is a screen capture of the final project plan for this phase.

Functional Decomposition

Functional Decomposition

Functional Decomposition

Benchmarking

Benchmarking Microcontrolers

Benchmarking Microcontrolers

Benchmarking Motors

Benchmarking Motors

Benchmarking Sensors

Benchmarking Sensors

A copy of the live document of Benchmarking for microcontrolers, motors and sensors can be found below.

Microcontroller Benchmarking
Motor Benchmarking
Sensor Benchmarking

Feasibility

Feasibility 1

Will there be enough time to complete testing to come to a reasonable conclusion? Study located here

Feasibility 2

Do all potential replacement couplings mount to the input and output shaft in a similar manner to each other? Study located here

Feasibility 3

What quality of test fixture base can be made, and can one be purchased that's currently on the market? Study located here.

Feasibility 4

Can the coordinate system of the test fixture can be made from off the shelf parts to save cost? Study located here.

Feasibility 5

Does our team have the necessary skills to get to a completed test fixture? Study located here.

Concept Development

Concept Brainstorming

Concept Brainstorming

Morphological Chart and Concept Selection

Morph Chart

Morph Chart

Concept Selection

Pugh Chart

Pugh Chart

Systems Architecture

System Architecture

System Architecture

A copy of the live document of System Architecture can be found here.

Designs and Flowcharts

Test Fixture Use Flow Chart

Test Fixture Use Flow Chart

A copy of the live document of the Testing Fixture Use Flow Chart can be found here.

Risk Assessment

Updated Risk Assessment

Updated Risk Assessment

A copy of the live document of Risk Management can be found here.

Plans for next phase

In the upcoming weeks as a team, we look forward to detailing the main aspects of the testing fixture design and preliminary setting up hardware for research and prototyping.

Project Management Future Plans

Project Management Future Plans


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation