P17708: Rochester SportNet Improvements
/public/

Gate Reviews

Table of Contents

Your team will hold a gate review with your guide at the end of each semester. This page should document any information needed for the review, as well as outcomes.

MSD I: Readiness to move to Build & Test

Plans for MSD II

Schedule

Senior Design II Schedule

Senior Design II Schedule


MSD II Action Items

The following are action items which were brought up in discussion during our Detailed Design Review and need to be completed at the beginning of MSD II. All action items will be completed by the end of week 3.
  1. The following tasks are to be completed by Mike over break.
    • Talk to Al Sigl people about using the I beam
    • Talk to Al Sigl people about the mezzanine being anchored to the walls
  2. The following tasks are to be completed by the team during the first couple weeks of the semester.
    • Determine the best method of installation for the trolley and chain hoist on the I beam.
    • Email architecture list to Dr. DeBartolo for use by future teams.
    • Determine the benefits of using nails versus screws, possibility use a combination of both.
    • How is the platform being anchored and will outside columns (not near walls) need to be anchored as well? (ie if golf cart runs into column)
    • Determine if a permit is needed for the platform and if it will need to be fire proof.
    • Design the bike carriers, taking into consideration trailer usage as well.
    • Create a side view of the layout to show differences in elevation.
    • Determine the best place to order maintenance ladders from, closer to Rochester is better due to extreme shipping costs.
    • Email and set up a meeting with RIT professor with large knowledge of cement walls.

ImagineRIT Scenarios


The ImagineRIT Plans can be accessed here - ImagineRIT Plans

Week 5 Demo Shared Vision

The following is our shared vision of the first demonstration, during week 5.

Problem Tracking

Problem Tracking

Problem Tracking

The Problem Tracking spreadsheet can be accessed here - Problem Tracking

Test Plan

Long Term Test Plans

Long Term Test Plans

The Long Term Test Plan spreadsheet can be accessed here - Long Term Test Plans

Team Self Reflection

Team Self Critique

Team Self Critique

The MSD I Self Critique spreadsheet can be accessed here - MSD I Self Reflection

MSD II: Project close-out