This page documents the process from the initial Problem Definition to a full Systems Level Design of the Assistive Motorcycle Sidecar.

Team Vision for System-Level Design Phase

For the systems design portion of the project, our teams goal was to take and translate our engineering requirements into a system concept and update risk analysis and plans to enable a full detailed design. All phase 1 actions from the Problem Definition have been completed.
Design Artifacts Status Key Processes Status
Function Decomposition Complete Project Management Complete
Morphological Chart Complete Risk Analysis Complete
Pugh Chart Complete Benchmarking Complete
Systems Architecture Complete Feasibility Reasearch Complete
Feasibility Analysis Complete

The purpose of this review is to update the customer on progress on the project, get approval to continue with the next phase, and gain valuable feedback on design concepts and plans.

Agenda

  1. Team Vision
  2. Agenda
  3. Problem Definition Refresh
  4. Function Decomposition
  5. Morphological Chart
  6. Benchmarking
  7. Concept Development
  8. Concept Selection Critera
  9. Final Concept
  10. Systems Architecture
  11. Feasibility Analysis
  12. Risk Analysis
  13. Phase Summary And Action Items
  14. Plans for Next Phase

Problem Definition Refresh

# Constraints Targets Limits
1 Maintain DOT/FMVSS Reg Meets N/A
2 Fitted for Ural Patrol Meets N/A
3 Maintain Ural Patrol Bolt Pattern Meets N/A
4 DOT Requirements on Windshield Meets N/A
5 Weight 110lbs 180lbs
6 Package Dimensions <70"x22"x18" <84"x24"x20"
7 Passenger has limited/no mobility <70"x22"x18" <84"x24"x20"
8 Budget <$3000 $3000
9 Limited Power Source None Only on Ingress
Customer Requirements

Customer Requirements

Engineering Requirements

Engineering Requirements

Customer Requirements

Engineering Requirements

Functional Decomposition

This Function Decomposition shows a top down method to identifying all required functions for the final design. The bottom level functions were taken into account when doing our system architecture and concept generation and selection. When reading the Function Decomposition, the lower level boxes should answer how we are going to accomplish the function above it. The upper box should answer why we need the box below it.
Functional Decomposition

Functional Decomposition

Mapping Engineering Requirements

Mapping Engineering Requirements

Morphological Chart

Morphological Chart

Morphological Chart

Morphological Chart

Benchmarking

Updated Benchmarking

Updated Benchmarking

Benchmarking

Concept Development

Three Selected Concepts

Three Selected Concepts

Concept Selection

Concept Selection Critera

Concept Selection Critera

Pugh Concept

Pugh Concept

Concept Selection Critera

Pugh Concept Selection

Final Concept

Final Concept

Final Concept

Final Concept GIF

Systems Architecture

Systems Arhitecture

Systems Arhitecture

Systems Architecture

Feasibility: Prototyping, Analysis, Simulation

Cost and Weight

Cost and Weight

Analysis of Rotating Door

Analysis of Rotating Door

Risk Assessment

Risk Assessment Chart

Risk Assessment Chart

Phase Summary & Action Items

Phase III

Phase III

A wheelchair has been located and having been communicating with the disability office to gain volunteers to test the inital design.

Plans For Next Phase

Schedule

Schedule

During this phase, our team has learned how to research more efficiently for benchmarking. We have also learned the importance of having a set test plan and following it closely. We have also further learned the importance of feedback for both our academic and engineering deliverables. Additionally, we have learned it is best to utilize existing subcomponents that are proven to work and not redesign our own.

Phase 3 Vision:

For the preliminary detailed design phase, our teams goal is to take our finalized concept and complete 80% of our preliminary sub system drawings and documentation.

Phase 3

Phase 3

Test Plan

Test Plan

Test Plans
Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation