Team Vision for Final Demo and Handoff

This phase, the team planned to:

- Execute and document all test plans

- Construct Imagine rig

- Complete course requirement final documentation (paper, poster)

- Make detailed documents about our recommendations for next year

This phase, the team:

- Executed and documented all test plans (all engineering requirements were met!)

- Constructed Imagine rig

- Completed paper, poster, and other required phase documentation

- Made detailed documents about our recommendations for future project iterations

- Created detail CAD model of proposed design improvements

- Modeled, ordered, and implemented PCB

 Assembled Imagine RIT Rig

Assembled Imagine RIT Rig

Pictures of Imagine Rig

 Final PCB

Final PCB

PCB Pictures

Test Results Summary

 Engineering Requirements and Test Plans

Engineering Requirements and Test Plans

Engineering Requirements and Test Plans

S1 Analysis

S1 Data

S10 Data

Testing Pictures and Videos

Risk and Problem Tracking

 Updated Risks

Updated Risks

 Problem Tracking

Problem Tracking

Risk Document

Problem Tracking

PCB BOM

Final Project Documentation

Technical Paper

Poster

Team Recommendations for Next Year

PCB Write Up

CAD Write up

CAD Images

Full Model 3D PDF

Current Hand Model 3D PDF

Hand Improvements 3D PDF

Future Hand Improvements

Future Mechanical Improvements

Future Software and Electrical Improvements

PCB Documents

Control Logic

Plans for Wrap-up

The team will use the rest of the semester to:

- Complete phase 4 review

- Complete lightning talk

- Participate in Imagine RIT

- Complete MSD II Post Mortem

- Participate in gate review (5 /1 at 10 am)

- Hand off all materials to customer

- Clean out work space and locker

- Get check list signed and hand it in


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation