P18047: Virtual Cane
/public/

Build & Test Prep

Table of Contents

Your website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original editable files).

All template text must be removed prior to your Build & Test Prep Review

Team Vision for Build & Test Prep Phase

The goal of this phase is to finalize design and begin final testing and building. In this phase, the following material was created :
Team Future Plan

Team Future Plan

Test Plan Summary

Test Plan

Test Plan

Bill of Materials

BOM

BOM

Virtual Cane Future

Future Plan Part 1

Future Plan Part 1

Future Plan Part 2

Future Plan Part 2

Future Plan Part 3

Future Plan Part 3

Document Type Link
Proposal Document OneNote/Web Proposal Link
Status Update Phase 1 PDF Status Update Link

Design Review Materials

Include links to:

Plans for next phase

Name Role Individual 3-Week Plan
Deepti Chintalapudi Project Manager Phase(I) Three-Week-Plan
Suhail Prasathong Team Lead Phase(I) Three-Week-Plan
AbdulAziz Alorifi Team Facilitator Phase(I) Three-Week-Plan
Josh Drezner Purchasing Phase(I) Three-Week-Plan
Stuart Burtner Engineer Phase(I) Three-Week-Plan

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation