P18083: Micropipette Tip Box Filler
/public/

Build & Test Prep

Table of Contents

Team Vision for Build & Test Prep Phase

Team Vision

Team Vision

Prototype Design

Shaded View

Shaded View

Some design changes to note are the hinged rails and the back board for the sorter. The hinge was added to the rails to allow a steeper slope for the pipettes to slide down if need, and for a better tip box loading angle. The sorter back board was added to help catch pipette tips since the orientation of the storage box has been flipped.

Left Side Wire Frame View

Left Side Wire Frame View

Front Wire Frame View

Front Wire Frame View

Test Plan Summary

Storage Flow Test

Storage Flow Test

Storage Flow Test

Storage Flow Test

Storage Flow Test

Storage Flow Test

Sorter Flow Test

Sorter Flow Test

Rail Lanes Flow Test

Rail Lanes Flow Test

Assembly Flow Test

Assembly Flow Test

Frame Strength Test

Frame Strength Test

Bill of Material

Bill of Material

Bill of Material

link to live Bill of materials

Risk and Problem Tracking

Risk Management

Risk Management

link to live Risk management

Problem Tracking

Problem Tracking

link to live Problem tracking

Plans for next phase

Goal for next phase

We plan to have a fully functioning prototype of our system built and tested for our Week 6 review.
Future Phase Plans

Future Phase Plans

System Build and Test Phase Individual Plans -

Parikshit Linga

Andrew

Abdallah


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation