Team Vision for Detailed Design Phase

TeamVision

TeamVision

Progress Report

The Pipetteers together had a vision for this phase to better set-up progress for the next phase and also to prepare for a gate review and sign off.

Progress Report

Prototyping, Engineering Analysis, Simulation

storage final

storage final

storage final

storage final

Sorter Prototype

Sorter Prototype

Sorter Design

Sorter Design

Support Structure Design

Support Structure Design

New lanes Deisgn

New lanes Deisgn

Groved Pipette Plate

Groved Pipette Plate

Bill of Material (BOM)

BOM Update

BOM Update

Updated Bill of Materials

Test Plans

Storage Design Breakdown
Table

Table

Without vibration

Without vibration

With vibration

With vibration

We have two critical test plans for the machine we plan on doing to increase the performance.

1) The Sorter where the tips will get vertically aligned will be tested for repeat ability and tips getting stuck.

Sorter test plan

Sorter test 1

Sorter test 2

2) The lanes will be tested at different widths and lengths with a knock on it. This will help us to determine the maximum length we can fix for the lanes before the tips start getting stuck.

Lanes Test Plan

Rails Testing Without Rotation

Rails Testing Without Rotation

Rails Testing With Rotation

Rails Testing With Rotation

Rails Testing When Pipette Dropped

Rails Testing When Pipette Dropped

Risk Assessment

Updated Risks

Updated Risks

link to Updated Risks

Plans for next phase

Plans for ImagineRIT

Plans for ImagineRIT

Team 4 week plans for next phase

Team 4 week plans for next phase

Individual Three Week Plans:

Andrew Mashayekhi

Abdallah Hassanein

Parikshit Linga


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation