P18222: RIT Baja Two-Node DAQ
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Team Vision for Final Demo and Handoff

Plan

Accomplished

Final Product

Tested in Tensile Tester

Tested in Tensile Tester

NI Test Results

NI Test Results

System Assembled

System Assembled

Tested on Car

Tested on Car

Car Test Results

Car Test Results

Test Results Summary

Engineering Requirements

Engineering Requirements

The live Test Plans document can be found here.

Risk and Problem Tracking

The latest risk's for the project.
Risk Assessment

Risk Assessment

The live Risk Assessment document can be found here.

The latest problem tracker:

Problem Tracker

Problem Tracker

Final Project Documentation

Final Documentation
Final BOM
Technical Paper
Poster
Lightning Talk Slide
Assembly/Operating Instructions
Node 1 Schematic
Node 2 Schematic
Main Schematic

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation