Table of Contents
|
Team Vision for Preliminary Detailed Design Phase
Team's plan for this phase:- Create test plans to ensure engineering requirements will be met.
- Select the materials needed to make a prototype.
- Create schematics/flowcharts of the entire system.
Team's accomplishment for this phase:
- Collected data from thermocouples and hall effects.
- Wrote software for CAN protocol.
- Created a preliminary bill of materials.
- Updated overall schematic and created schematics for individual nodes.
- Created a software flowchart.
- Created test plans for the engineering requirements.
- Added new risks to the risk assessment document.
- Created a plan for next phase.
Lab Testing
Testing Thermocouples
Testing Hall Effects
Drawings, Schematics, Flow Charts, Simulations
Overall Schematic
Strain Gauges
Enclosure
Software Flowcharts
Bill of Material (BOM)
The live Bill of Materials can be found here.
Test Plans
Measure Data from Hall Effect
Test is to confirm data can be collected from the hall
effect sensors at the required sampling rate of 100Hz.
Below is how the test will be performed.
Measure Data from Full Bridge Strain Gauge
Setup
Test is to confirm data can be collected from the strain
gauges at the required sampling rate of 500Hz. Below is
how the test will be performed.
Measure Data from Thermocouples
Test is to confirm temperature readings from a
thermocouple can be obtained at the desired rate of 1
Hz.This test will be performed as stated in the software
flowchart for thermocouples above.
SD Card
Test is to confirm data can be saved onto an SD Card.
This test will be performed as stated in the software
flowchart for SD cards above.
Test is to confirm data can be Transferred via CAN (Controller Area Network). This test will be performed as stated in the software flowchart for CAN above.
IP Standard for Connectors
Test is to make sure IP standards will be met for the
connectors.
IP Standard for Enclosure
Test is to make sure IP standards will be met for the
enclosure.
The live test plans can be found here.
Risk Assessment
The risk's of the project were reassessed and several new risks were added.The live Risk Assessment document can be found here.
Plans for next phase
The live schedule can be found here.
Individual Plans
Member | Plan |
---|---|
Odysseus Adamides | Phase 4 |
Amanda Vallat | Phase 4 |
Ross Erwin | Phase 4 |
Joseph Green | Phase 4 |
Home | Planning & Execution | Imagine RIT
Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design
Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation