Integrated System Build & Test

Table of Contents

Team Vision for Integrated System Build & Test Phase

During this phase, the team planned to implement permanent buttons and lights onto the test bench while also finishing up the GUI and validating the data. The team also planned to validate that several project engineering requirements have been met. These goals were accomplished, and test bench progress is shown below.

Test Results Summary

Test Plans and results can be found here

Risk and Problem Tracking

Functional Demo Materials

A snapshot of the current progress of the GUI can be seen below. In this case, the GUI is live and connected to an active test bench. In addition to successfully updating a live CAN value, the GUI can now successfully interpret faults and bit entries as shown below. Another addition has been the option whether to download a .xlsx or .csv log file.

Active GUI Screenshot

Active GUI Screenshot

The in-use test bench can be seen below. The movable shelves have been altered to be fit the 2017-18 Hot Wheelz Electrical Design. Notice that some shelves are used for mounting components, while others are used for tool storage.

Test Bench Side 1

Test Bench Side 1

Test Bench Side 2

Test Bench Side 2

A close-up of the motor shelf:

Motor Pull-Out Shelf

Motor Pull-Out Shelf

A firewall was added to the high voltage battery portion of the test bench. Below, it can be seen that hinges were added to make the batteries easily accessible, while still being safe when not in use.

Closed Firewall

Closed Firewall

Open Firewall

Open Firewall

Last, a permanent "Command Center" shelf was added. This shelf includes all shutdown and control buttons needed to test the full electrical system. It also has voltage indication lights at each point in the shutdown path and each low voltage supplies. Below you can see the lights for completed, and partial shutdown.

Completed Shutdown Circuit with Voltage Indication Lights

Completed Shutdown Circuit with Voltage Indication Lights

Partial Shutdown Circuit with Voltage Indication Lights

Partial Shutdown Circuit with Voltage Indication Lights

Below are the required sensor interfaceing to get live data from the test bench to the user GUI.

Implemented Sensor Circuitry

Implemented Sensor Circuitry

Risk and Problem Tracking

An updated copy of the team's risk assessment can be found here Risk Management

Current Risk Table

Current Risk Table

Projected Risks

Projected Risks

Plans for next phase

Prepare for Hot Wheelz testing which will occur over the next month

Here is the updated timeline


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation