Desired Review Outcomes

Team Vision for Detailed Design Phase

Progress Report

Project Progress:
Progress Report

Progress Report

Risk Mitigation:Phase 4

Risk Mitigation:Phase 4

Recap of Customer & Engineering Requirements

Customer Requirements

The customer requirements from the Problem Definition page are reproduced below for convenience in comparing with proof of concept tests and calculations.

Customer Needs List

Customer Needs List

Click here for a link to the live document.

Engineering Requirements

The engineering requirements from the Problem Definition page are reproduced below for convenience in comparing with engineering test plans.

Engineering Requirements

Engineering Requirements

Click here for a link to the live document.

Engineering requirements testing listed in the above document are high level summaries of the planned test. Detailed test plans specific to each engineering requirement are located in the Test Plans section near the bottom of this page.

Prototyping, Engineering Analysis, Simulation

System Model Graphs

Click here for a link to the simulation derivations

Fatigue Analysis

Click here for a link to the Fatigue Summary

Click here for a link to the Mechanical Fatigue Summary

Click here for bearing fatigue.

Pelican Storage Container

Pelican Storage Container

Drawings, Schematics, Flow Charts, Simulations

Total System

Total System

Vibration System

Vibration System

Click here for a link to a video of the animated assembly.

Click here for a link to all vibration system drawings.

Click here for a link to the base plate drawing. Click here for a link to the Plexi-Glass Lid drawing.

Electrical Box

Electrical Box

Click here for a link to a video of the animated assembly.

Click here for a link to all electrical box drawings.

Click here for a link to the epoxy application procedure for the electrical box assembly.

Electrical Drawing

Electrical Drawing

Click here for a link to the live document.

Bill of Material (BOM)

Bill Of Materials

Bill Of Materials

Click here for a link to the live document.

Proof of Concept

Non Technical GUI

Non Technical GUI

Technical GUI

Technical GUI

Click here for acceleromenter data capture.

Pre-Build Test Plans

Eng. Requirements Description Marginal Value Ideal Value Test Result PB Test Plan PDF
ER1 Two Separate, Identical Vibration Systems 2 2

2 Identical Systems

P1 pdf
ER2 Low Frequency Sine Wave Operation 5-20Hz 8Hz

10Hz +/-1

P9 pdf
ER3 Single DOF Systems True True

True

P2 pdf
ER4 Live Processing And Data Graphing True True

True

P8 pdf
ER5 Self Contained Software Package False True

True

P8 pdf
ER6 Accurate Vibration Measurement 0.1 G 0.01 G

0.59 G

None data sheet
ER7 Rugged Design True True

True

P3 pdf . bearing fatigue . mechanical fatigue
ER8 Display Contains Replacement for Wear Susceptible Parts False True

True

P4 pdf
ER9 No Signal Interference True True

SME Confirmation

None SME
ER10 Guarded Moving Parts True True

True

P5 pdf
ER11 Aesthetically Pleasing 75% Yes 90% Yes

Guide/Customer Approval

P6 pdf
ER12 Switch between technical/non-technical displays False True

True

P8 pdf
ER13 Fully Commented and Explained Code True True

True

P8 pdf
ER14 Setup Time < 15 mins 15min 10min

Feasible, will test during MSD II

P7 pdf

Summary Matrix

Test Plan

Test Plan

Click here for a link to the live document.

Project Plans

Phase 4 Review

Phase 4 Gantt Chart

Phase 4 Gantt Chart

Phase 4 Assignments

Phase 4 Assignments

MSD II Vision

MSD II Deliverables

MSD II Overview

MSD2 Overview

MSD2 Overview

MSD II Gantt Chart

MSD II Gantt Chart

Lessons Learned

Lessons Learned

Apply to MSD II

MSD Class Suggestions


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Customer Handoff & Final Project Documentation